鸟巢英语?鸟巢:Beijing National Stadium (Bird's Nest/Olympic Stadium)水立方:National Swimming Center (The water Cube)这两个词本身就是专有名词,如果说鸟巢的什么什么应该用它的所有格形式:bird`s nest`s ,the water cube`s 或者用the & of BEIJING NATIONAL STADIUM the & of the water cube 好的话采纳哦。那么,鸟巢英语?一起来了解一下吧。
Bird's Nest/Olympic Stadium
地点:奥林匹克公园
场地类型:新建比赛场馆
奥运会期间用途:开闭幕式、田径、男子足球
建筑面积(㎡):25.8万
固定座位数:80000个
临时座位数:11000个
建设开工时间:2003年12月24日
计划完工时间:2008年3月
赛后功能:将用于国际国内体育比赛和文化、娱乐活动
“鸟巢”独特的外形曾经让很多人不解甚至嘲弄,但它却源于设计者“做一个朴素的、原始的体育场”的想法,入“巢”而忘“巢”,是“鸟巢”设计者要达到的目的,让观众在场外被“鸟巢”巨大独特的外“形”吸引,而一旦进入“巢”内的看台坐席,可以不再被上方的建筑结构“诱惑”而将注意力集中到下方的赛场。
2006年9月17日,2008年北京奥运会主会场——国家体育场钢结构成功卸载,卸载后,“鸟巢”重达4.2万吨的钢结构摆脱外力的支撑,靠自己站立起来。

鸟巢
bird's nest更多释义>>
[网络短语]
鸟巢Bird's Nest;Bird Nest;The Birdhouse
北京鸟巢beijing bird's nest
鸟巢床Bird's Nest
水立方
the Water Cube;National Swimming Center更多释义>>
[网络短语]
水立方Water Cube;Cube;Liquid Cubed
水的立方体Water Cube
香芒水立方Mango Water Cube

鸟窝英语:bird's nest
例句:
When abird’snestis overturned, no egg can remain intact.
覆巢之下无完卵。
After a false start, he stumbled forward for a few paces obviously hindered by the injury to his right leg before walking away and leaving a packedBird'sNeststadium in stunned silence.
当他准备起跑时,表情很痛苦。当比赛开始时,他向前蹒跚了几步,很明显是由于右腿的伤势,随后刘翔退出了比赛。
Viewed form the top, it looks as if the stadium is covered by a gray net of steel, and it just like abird'snestmade of tree branches.
从顶部看去,体育馆好像被灰色的钢网所罩住,看上去就像树枝形成的鸟巢。
楼主自己选择下,这个是关于鸟巢的英文介绍哦:
Beijing National Stadium (Bird's Nest/Olympic Stadium)
The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. The stadium will seat as many as 100,000 spectators during the Olympics, but this will be reduced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004.
In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst reducing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005.
In depth
The stadium's appearance is one of synergy, with no distinction made between the facade and the superstructure. The structural elements mutually support each other and converge into a grid-like formation - almost like a bird's nest with its interwoven twigs. The spatial effect of the stadium is novel and radical, yet simple and of an almost archaic immediacy, thus creating a unique historical landmark for the Olympics of 2008.
The stadium was conceived as a large collective vessel, which makes a distinctive and unmistakable impression both from a distance and when seen from up close. It meets all the functional and technical requirements of an Olympic National Stadium, but without communicating the insistent sameness of technocratic architecture dominated by large spans and digital screens.
Visitors walk through this formation and enter the spacious ambulatory that runs full circle around the stands. From there, one can survey the circulation of the entire area including the stairs that access the three tiers of the stands. Functioning like an arcade or a concourse, the lobby is a covered urban space with restaurants and stores that invite visitors to stroll around. Just as birds stuff the spaces between the woven twigs of their nests with a soft filler, the spaces in the structure of the stadium will be filled with inflated ETFE cushions. Originally, on the roof, the cushions were to be mounted on the outside of the structure to make the roof completely weatherproof, but the roof has been omitted from the design in 2004.
While the rain was to be collected for rainwater recuperation, the sunlight was to filter through the translucent roof, providing the lawn with essential ultraviolet radiation. On the facade, the inflated cushions will be mounted on the inside of the structure where necessary, e.g. to provide wind protection. Since all of the facilities -- restaurants, suites, shops and restrooms -- are all self-contained units, it is possible to do largely without a solid, enclosed facade. This allows for natural ventilation of the stadium, which is the most important aspect of the stadium's sustainable design.
The sliding roof was an integral part of the stadium structure. When it was to be closed, it would have converted the stadium into a covered arena; however, the sliding roof was eliminated in an effort to cut costs and increase overall safety of the radical new structure.
Beijing National Stadium
Bird's Nest/Olympic Stadium
Facility statistics
Location Beijing
Broke ground Dec 2003
Opened Unknown
Closed N/A
Demolished N/A
Owner
Surface Grass
Construction cost 3.5 billion yuan
Architect Herzog & de Meuron
ArupSport
CAG
Tenants
Seating capacity
91,000 (80,000 Post Olympics)

1.北京奥运国家体育场就是俗称的"鸟巢"
"鸟巢"的英文名称是Nest-type Beijing Olympic Stadium或者Beijing National Stadium (Bird's Nest/Olympic Stadium)
鸟巢英文单词是bird nest
2."水立方"的英文是water cube Beijing National Aquatics Cente或water cube
“鸟巢”和“水立方”的英文简介
Beijing National Stadium
TheBeijing National Stadium(traditional Chinese:北京国家体育场;simplified Chinese:北京国家体育场;Hanyu Pinyin:Běijīng Guojiā Tǐyuchǎng;Tongyong Pinyin:Běijīng Guojiā Tǐyuchǎng), also known as theNational Stadium,[1]or the "Bird's Nest" (鸟巢) for itsarchitecture, is astadiumunder construction on theOlympic GreeninBeijing,Chinathat is scheduled for completion in March, 2008[2]. The stadium will host the main track and field competitions for the2008 Summer Olympics, as well as the opening and closing ceremonies. It is located right next to theBeijing National Aquatics Centre.
Design
In 2002, Government officials engaged architects worldwide in a design competition.Pritzker Prize-winning architectsHerzog & de Meuroncollaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist,Ai Weiwei, is the Artistic Consultant for design.[3]The ground was broken onChristmas EveDecember2003, and construction started inMarch2004, but was halted by the high construction cost inAugust2004and continued again. InJanuary 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died during the stadium's construction.[4]Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.
Capacity
The stadium canseatas many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of theGuangdong Olympic Stadium[citation needed]. The stadium is 330metreslong by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000square metresof space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5billionyuan(≈423 millionUSD).
Upon completion, this stadium will boast a state of the art Solar PV system produced bySuntech Power[
Beijing National Aquatics Centre
TheBeijing National Aquatics Centre, also known as theWater Cube(or abbreviated[H2O]3[1]), is an aquatics centre that was built alongsideBeijing National Stadiumin theOlympic Greenfor the2008 Summer Olympics. Ground was broken on December 24, 2003.
Design
In 2002, Government officials engaged architects worldwide in a design competition.Pritzker Prize-winning architectsHerzog & de Meuroncollaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist,Ai Weiwei, is the Artistic Consultant for design.[3]The ground was broken onChristmas EveDecember2003, and construction started inMarch2004, but was halted by the high construction cost inAugust2004and continued again. InJanuary 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died during the stadium's construction.[4]Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.
Capacity
The stadium canseatas many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of theGuangdong Olympic Stadium[citation needed]. The stadium is 330metreslong by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000square metresof space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5billionyuan(≈423 millionUSD).
Upon completion, this stadium will boast a state of the art Solar PV system produced by
Suntech Power[
以上就是鸟巢英语的全部内容,8. 鸟巢:The Nest(通常指国家体育场)9. 故宫博物院:the Palace Museum(与故宫的英文表达可互换使用)10. 革命历史博物馆:the Museum of Revolutionary History 11. 国子监:Imperial College(注意,内容来源于互联网,信息真伪需自行辨别。如有侵权请联系删除。